page i |
Previous | 1 of 529 | Next |
|
small (250x250 max)
medium (500x500 max)
large ( > 500x500)
Full Resolution
|
This page
All
Subset |
M pos dmm hdm 41v0 1 fo itali ltali afi 1fi ialftel s goo coo gob mm dim amad 4mad uu1111ai y v jsu inan iman gnan y 9 a 355 WEST university PARKWAY OREM UTAH 840587303 84058 7303 OFFICERS TELEPHONE 801 2267100 226 7100 FAX 801 2267107 226 7107 E tim doxey president R roscoe garrett vice president WEBSITE wwwcuwcdcom don A christiansen general manager secretarytreasurer Secretary Treasurer october 22 222001 2001 dear reader subject lake fork section 203 alternative S section 203a uinta basin replacement project final environmental assessment and finding of no significant impact the central utah water conservancy district and the department of the interior have developed a final environmental assessment EA for the lake fork section 203 alternative section 203a 203 a uinta basin replacement project this alternative was selected after receiving comments on a draft EA which was subn hubn submitted dtted dated to the public for review on february 12 2001 the final EA incorporated the comments and was modified to include the 9 high mountain lakes in the yellowstone drainage as a result of overwhelming support by the cooperating agencies and the public the department of the interior has issued a finding of no significant impact FONSI signed october 19 192001 2001 the final EA and FONSI are enclosed for your information and we thank you for your interest and participation in the decision making process for this project sincerely don A christiansen general manager BOARD OF TRUSTEES uton G blood evans tim doxey claude R hicken patricia A ororke W howard riley john L west eo L brady R roscoe garrett roger W hicken gary D palmer james J smedley robert F weyher jr brent brotherson harley M gillman rondal R mckee david R rasmussen stanley R smith boyd workman
Object Description
| Rating | |
| Author |
Central Utah Water Conservancy District (Utah) |
| Title | Finding of No Significant Impact Lake Fork Section 203 Alternative : Proposed Action |
| Description | The finding of this document concluded that implementing the Lark Fork Assessment for the Section 203(a), Uinta Basin Replacement Project dated October 2001, will not have a significant impace on the quality of the human environment and than an environmental impact statement is not required. The decision was made to implement the proposed action. |
| Edition | Electronic reproduction; |
| Publisher Original | Central Utah Water Conservancy District |
| Date Original | 2001-10 |
| Publisher Digital | Brigham Young University |
| Date Digital | 2005-10-27 |
| Physical Description | 1 vol, various paging |
| Owning Institution | Brigham Young University; |
| Subject |
Central Utah Project. Uintah Unit |
| Genre |
Reports |
| Language | English; eng; en |
| Collection | Central Utah Project; Western Waters Digital Library; |
| Patron Usage Instructions | http://www.lib.byu.edu/generic_copyright.html |
| Copyright Status/Owner | Public Domain |
| Type | Text |
| Format | text/PDF |
| Library Call Number | NONE |
| Chapter | October 2001 |
| Access Level | Public |
| System Requirements | Internet Connectivity. Worldwide Web browser. Adobe Acrobat reader |
Description
Tags
Comments
Post a Comment for page i
